Environmental ConservationDepartment Contact Information

Search

Files on this page are in html or Adobe Acrobat (PDF) format. To read the PDF documents, you need to install Adobe Acrobat Reader 4.0 on your computer. This program is FREE and may be downloaded from the Adobe website. The larger documents have the page amounts listed. NOTE: If the document doesn't load correctly, "REFRESH" or "RELOAD" your page.

 Link to Department Summary
Overview of the department's budget and key performance measures.

 Performance Measures
Performance measures in all areas of the department.
(38 pages, 166KB)

Capital Budget Detail
Narrative and financial descriptions of each project.

  Complete Operating Budget
Use this section to view or print the entire department budget, including all performance measures (174 pages, 606 KB). To view or print specific programs within a department, see below.

 Operating Budget Detail
Index to all levels of the department'sbudget. There are three levels: the overall department summary, budget request units (which generally correspond to divisions), and components (specific program areas). These and other budget-related terms are defined in the Glossary.


Operating Budget Detail
The Components on the right are subdivisions of the Budget Request Unit on the left.

Department of Environmental Conservation

Budget Request Unit

Component
Administration Office of the Commissioner
Administrative Services
Exxon Restoration
Environmental Health Environmental Health Director
Food Safety & Sanitation
Laboratory Services
Drinking Water
Solid Waste Management
Statewide Public Services Statewide Public Services
Air and Water Quality Air and Water Director
Air Quality
Water Quality
Commercial Passenger Vessel Environmental Compliance Program
Non-Point Source Pollution Control Non-Point Source Pollution Control
Spill Prevention and Response Spill Prevention and Response Director
Contaminated Sites Program
Industry Preparedness and Pipeline Operations
Prevention and Emergency Response
Response Fund Administration
Local Emergency Planning Committees Local Emergency Planning Committees
Facility Construction and Operations Facility Construction and Operations

 Capital Budget
Full descriptions are indexed below.
( Allocations are expenditure guidelines for particular purposes within an appropriation. )
Appropriation/
Allocation
Project Title
Appropriation Village Safe Water Feasibility Studies
     Allocation      Kwigillingok Piped Water and Sewer Feasibility Study
     Allocation      Arctic Village Water and Sewer Haul Feasibility Study
     Allocation      Platinum Water and Sewer Feasibility Study
     Allocation      Akutan Water and Sewer Feasibility Study
     Allocation      Pilot Station Sewage Lagoon Feasibility Study
     Allocation      Chistochina Facility Plan
     Allocation      Ballaine Lake Service Area Sewage Disposal Feasibility Study
     Allocation      Grayling Water Feasibility Study
     Allocation      Nanwalek Wastewater Discharge Permit Dilution Analysis and Design
     Allocation      Port Heiden Water and Wastewater Feasibility Study
     Allocation      Scammon Bay Future Water and Sewer Upgrade Study
     Allocation      Nightmute Study for Solid Waste Site and Washeteria
     Allocation      Shaktoolik Landfill and Septic Sludge Pit Study
     Allocation      False Pass Wastewater Treatment and Disposal Feasibility Study
     Allocation      Hydaburg Water Source Optimization and Conservation Study
     Allocation      Kiana Water Treatment Plant Study (Manganese Removal)
     Allocation      Seldovia Water and Sewer Feasibility Study
     Allocation      Upper Kalskag Public Watering Point Study
     Allocation      Chalkyitsik Landfill Relocation Feasibility Study
     Allocation      Chenega Bay Sanitation Utilities Feasibility Study
     Allocation      Diomede Solid Waste Feasibility Study
     Allocation      Bethel Kasayuli Subdivision Water and Sewer Feasibility Study
     Allocation      New Stuyahok Utility Master Plan
     Allocation      Nikolaevsk Third Village Water and Sewer Feasibility Study
     Allocation      Noorvik Sanitation Facilities Master Plan Update
     Allocation      Toksook Bay Comprehensive Utilities Plan
     Allocation      Angoon Sewer and Water Feasibility Study
     Allocation      Galena City Utilization of Airbase Water System Feasibility Study
     Allocation      Selawik Water and Sewer System Expansion Feasibility Study
     Allocation      Twin Hills Water Source Study and Test Well Drilling
     Allocation      Kotzebue Uptown Final Loop Design and Hillside Water and Sewer Study
     Allocation      Tyonek Well Test Pumping and Pilot Filter Study
Appropriation Village Safe Water Projects
     Allocation      Chalkyitsik Water and Sewer Project - Phase 2
     Allocation      Galena Water and Sewer - Phase 2
     Allocation      Tuluksak Water and Sewer Project - Phase 1
     Allocation      Fort Yukon Water and Sewer Project - Phase 3
     Allocation      Kwethluk Water and Sewer Project
     Allocation      Huslia Sewer and Solid Waste Improvements
     Allocation      Kipnuk Lagoon and Force Main
     Allocation      Tanana Water and Sewer Project
     Allocation      Aniak Sewer System Improvements
     Allocation      Marshall Water and Sewer Project
     Allocation      Bethel Water and Sewer Project
     Allocation      Hooper Bay Water and Sewer Project
     Allocation      Pilot Point Solid Waste, Sewer and Water Improvements
     Allocation      Tanacross Water Facility Improvements
     Allocation      Saint Michael Sanitation Facilities Improvements
     Allocation      Quinhagak Sanitation Improvements
     Allocation      Chuathbaluk Sanitation Improvement Project - Phase 1
     Allocation      Kasigluk Washeteria, Water Treatment Plant and Storage Tank Construction
     Allocation      Kongiganak Sanitation Facilities Improvements - Phase 2
     Allocation      Nunam Iqua Wastewater Treatment Improvements
     Allocation      Aleknagik North Shore Liquid Waste Stabilization and Landfill Facility
     Allocation      Beaver Water and Sewer Project
     Allocation      Elfin Cove Drinking Water Project
     Allocation      Ouzinkie Sewer and Water Improvements - Phase 1
     Allocation      Sleetmute Water and Sewer Improvements - Phase 1
     Allocation      Tuntutuliak Water and Sewer Project
     Allocation      Brevig Mission Water and Sewer
     Allocation      Napaskiak Sanitation Improvements Project - Phase 4
     Allocation      Port Protection Water Tank Retaining Wall for Hillside Stabilization
     Allocation      Kwigillingok Sanitation Facilities
     Allocation      Ambler Water and Sewer Improvements - Phase 3
     Allocation      Anchor Point Water System Expansion - Phase 3
     Allocation      False Pass Water System Improvements
     Allocation      Kotzebue Sewage Lagoon Expansion and Improvements
     Allocation      Shungnak Water Treatment Plant and Storage Facility Project
     Allocation      Alatna Water Supply and Sewage Collection and Treatment - Phase 3
     Allocation      Pelican Water and Sewer Improvements
     Allocation      Mekoryuk Water Distribution Infrastructure and Source Improvements - Step 3A
     Allocation      Nunapitchuk Sewage Lagoon and Bunker Closure and Sanitation Improvements
     Allocation      Noorvik Water Treatment Plant, Water Intake Upgrades and Honey Bucket Dump Facility
     Allocation      Egegik Water and Sewer Project - Phase 3
Appropriation Village Safe Water Project Administration
Appropriation Municipal Water, Sewer and Solid Waste Matching Grant Projects
     Allocation      Haines Mud Bay Water and Sewer Study
     Allocation      Ketchikan Shoreline Drive Water and Sewer Analysis and Preliminary Design
     Allocation      Sand Point Wastewater Improvement Analysis
     Allocation      Soldotna Funny River Road Water and Sewer Analysis and Preliminary Design
     Allocation      Unalaska Leachate Collection and Treatment Analysis
     Allocation      Matanuska Susitna Borough Central Landfill Expansion - Phase 2
     Allocation      Palmer Wastewater Treatment Expansion - Phase 3
     Allocation      Juneau North Douglas Sewer Extension Project - Phase 2
     Allocation      Cordova Wastewater Treatment Plant Upgrade - Phase 2
     Allocation      Ketchikan Tongass Avenue Water and Sewer Improvements
     Allocation      Palmer Water System Improvements - Phase 2A
     Allocation      Kenai Well House Number 4 with Main Line Tie-Ins - Phase 3
     Allocation      Klawock Three Mile Water Intake
     Allocation      Wasilla Septage Facility Emergency Generator
     Allocation      Matanuska Susitna Borough Garden Terrace Water System Renovation
     Allocation      Petersburg Airport Sewer Project
     Allocation      Wrangell Bennet Street Water Mains Extension - Phase 1
     Allocation      Wrangell Cassiar and Weber Sewer and Water Main Replacement
     Allocation      Craig Water Treatment Plant Upgrades
     Allocation      Sitka Sawmill Cove Industrial Park Wastewater Outfall
     Allocation      Homer One Million Gallon Storage Reservoir
     Allocation      King Cove Landfill Expansion Design
     Allocation      Soldotna Funny River Road Water and Sewer Mainline Extension
     Allocation      Valdez Wastewater System Improvements
     Allocation      Kodiak Monashka Dam Enlargement - Phase 2
     Allocation      Nome Water and Sewer System Expansion - Phase 4
     Allocation      North Pole Badger-Hurst Water Transmission Main
     Allocation      Talkeetna Wastewater Treatment Facility
     Allocation      Ketchikan International Airport Wastewater Plant
     Allocation      Petersburg Landfill Closure
     Allocation      Seward Gateway to Forest Avenue Waterline Extension
     Allocation      Anchorage Water, Wastewater and Water Quality Projects
Appropriation Statewide Municipal Solid Waste Regionalization Plan
Appropriation Statewide Contaminated Sites Cleanup
Appropriation Spill Prevention - Best Available Technology Analysis
Appropriation Corrosion Monitoring and Control - Best Management Practices
Appropriation Petroleum Storage Tank Spill Prevention Standards Review
Appropriation Language Section: Alaska Drinking Water Fund
Appropriation Language Section: Alaska Clean Water Fund
Appropriation Fine Particulate Monitoring

 Department Contact Information


 

Department of Environmental Conservation 

Commissioner: Michele Brown
Tel: (907) 465-5065 Fax: (907) 465-5070

Administrative Services Director: Barbara Frank
Tel: (907) 465-5256 Fax: (907) 465-5097



FY2003 Budget Page / OMB / Office of the Governor / State of Alaska / Webmaster / Contact Us / Top of Page