Appropriation/
Allocation |
Project Title |
| Appropriation |
Management Reporting
System Efficiency - Analysis and Development |
| Appropriation |
Safety Inspection of
State Owned High Risk Facilities |
| Appropriation |
Material Stockpiles:
Dalton - Elliott Highway |
| Appropriation |
Valdez - Harborview
Development Center |
| Appropriation |
Weights and Measures
Testing Unit Replacement |
| Appropriation |
Alaska Marine Highway
System: Overhaul, Rehabilitation, and Mandatory Training |
| Appropriation |
Facilities Deferred
Maintenance and Critical Repairs |
| Appropriation |
Emergency and Non-Routine
Repairs |
| Appropriation |
Corps of Engineers -
Harbors Program |
| Appropriation |
Harbor Deferred Maintenance |
| Appropriation |
Airport Deferred Maintenance |
| Appropriation |
Highway Deferred Maintenance |
| Appropriation |
State Equipment Fleet
Replacement |
| Appropriation |
Statewide Federal Programs |
| Allocation |
Capital
Improvement Program Equipment Replacement |
| Allocation |
Cooperative
Reimbursable Projects |
| Allocation |
AMD-Coordinated
Transportation and Vehicles |
| Allocation |
Federal-Aid
Aviation State Match |
| Allocation |
Federal-Aid
Highway State Match |
| Allocation |
Federal
Emergency and Contingency Projects |
| Allocation |
Federal
Transit Administration Grants |
| Allocation |
Highway
Safety Grants Program |
| Allocation |
Statewide
Safety Program |
| Appropriation |
Airport Improvement Program |
| Allocation |
AMD-Akutan:
Airport Master Plan |
| Allocation |
AMD-Alaska
International Airport System: Development Fund |
| Allocation |
AMD-Alaska
International Airport System: Emergency and Reserve Funds |
| Allocation |
AMD-Alaska
International Airport System: Repair or Replacement Program |
| Allocation |
AMD-Angoon:
Airport Master Plan |
| Allocation |
Anvik:
Airport Rehabilitation |
| Allocation |
AMD-Atka:
Airport Resufacing and Extension |
| Allocation |
Barrow:
Runway and Apron Paving/Safety Area Expansion Stage 1 |
| Allocation |
Barrow:
Runway and Apron Paving/Safety Area Expansion Stage 2 |
| Allocation |
Bettles:
Float Plane Base Improvement |
| Allocation |
AMD-Birch
Creek: Airport Resurfacing |
| Allocation |
Birchwood:
Airport Master Plan Stage 2 |
| Allocation |
Chignik:
Snow Removal Equipment - Grader |
| Allocation |
Chuathbaluk:
Airport Relocation |
| Allocation |
Cold
Bay: Airport Rescue and Firefighting Vehicle |
| Allocation |
Crooked
Creek: Airport Master Plan Stage 2 |
| Allocation |
Deering:
Airport Rehabilitation |
| Allocation |
AMD-Dillingham:
Airport Master Plan |
| Allocation |
Eek:
Airport Relocation Phase 2 |
| Allocation |
Eek:
Snow Removal Equipment - Loader with Boss Plow |
| Allocation |
AMD-Elim:
Airport Resurfacing |
| Allocation |
Elim:
Snow Removal Equipment - Grader |
| Allocation |
AMD-Emmonak:
Rehabilitation and Apron Expansion |
| Allocation |
AMD-Emmonak:
Snow Removal Equipment - 720 Grader |
| Allocation |
Fairbanks
International Airport: Airport Rescue and Firefighting Facility
Repairs |
| Allocation |
AMD-Fairbanks
International Airport: Annual Improvements |
| Allocation |
Fairbanks
International Airport: Drainage Improvements Phase 3 |
| Allocation |
Fairbanks
International Airport: East Side Utilities Phase 2 |
| Allocation |
Fairbanks
International Airport: Environmental Assessment and Cleanup |
| Allocation |
AMD-Fairbanks
International Airport: Equipment |
| Allocation |
Fairbanks
International Airport: Preliminary Planning and Scoping Studies |
| Allocation |
Fairbanks
International Airport: Terminal Heating, Ventilation and Air
Conditioning System Improvements |
| Allocation |
AMD-Fairbanks
International Airport: Terminal Improvement Phase 2 Construction |
| Allocation |
Fairbanks
International Airport: Terminal Roof Replacement Construction |
| Allocation |
Hoonah:
Airport Lighting |
| Allocation |
AMD-Hughes:
Snow Removal Equipment - Grader |
| Allocation |
AMD-Kaltag:
Snow Removal Equipment - Grader |
| Allocation |
Ketchikan:
Runway and Taxiway Light Replacement - Stage 2 |
| Allocation |
Kivalina:
Airport Resurfacing |
| Allocation |
Klawock:
Sand & Chemical Storage Building |
| Allocation |
Klawock:
Terminal Building and Parking Lot |
| Allocation |
Kobuk:
Airport Reconstruction |
| Allocation |
AMD-Kokhanok:
Airport Resurfacing and Lighting |
| Allocation |
Koyukuk:
Airport Rehabilitation |
| Allocation |
Lake
Hood: General Aviation Parking and Taxiway Relocation |
| Allocation |
Lake
Hood: Lake Dredging and Bank Stabilization |
| Allocation |
AMD-Lake
Louise: Runway Rehabilitation |
| Allocation |
Little
Diomede: Snow Removal Equipment - Dozer |
| Allocation |
AMD-Manokotak:
Snow Removal Equipment - Grader |
| Allocation |
Metlakatla:
Seaplane Float Terminal Building |
| Allocation |
AMD-Minchumina:
Snow Removal Equipment - Loader |
| Allocation |
AMD-Nikolai:
Airport Improvements |
| Allocation |
Noorvik:
Airport Relocation - Stage 3 |
| Allocation |
Nunapitchuk:
Resurfacing and Lighting |
| Allocation |
AMD-Ouzinkie:
Airport Master Plan Stage 3 |
| Allocation |
Perryville:
Snow Removal Equipment - Grader |
| Allocation |
Petersburg:
Airport Master Plan Update |
| Allocation |
Petersburg:
Sand & Chemical Storage Building |
| Allocation |
AMD-Point
Hope: Snow Removal Equipment - Grader |
| Allocation |
AMD-Point
Hope: Snow Removal Equipment - Loader |
| Allocation |
Port
Heiden: Snow Removal Equipment - Grader |
| Allocation |
Port
Lions: Airport Master Plan Stage 2 |
| Allocation |
Shaktoolik:
Snow Removal Equipment - Grader |
| Allocation |
Shishmaref:
Snow Removal Equipment - Grader |
| Allocation |
AMD-Sitka:
Apron and Taxiway Reconstruction |
| Allocation |
Statewide:
Aviation Preconstruction |
| Allocation |
Statewide:
Aviation Systems Plan Update |
| Allocation |
Statewide:
Various Airports Minor Surface Improvements |
| Allocation |
Stevens
Village: Airport Relocation - Stage 1 |
| Allocation |
Stony
River: Airport Rehabilitation |
| Allocation |
Talkeetna:
Airport Improvement - Stage 2 |
| Allocation |
Ted
Stevens Anchorage International Airport: Advanced Project/Parking
Design Study |
| Allocation |
Ted
Stevens Anchorage International Airport: Airfield Electrical
and Lighting Rehabilitation and Upgrades |
| Allocation |
Ted
Stevens Anchorage International Airport: Airfield Pavement Maintenance |
| Allocation |
Ted
Stevens Anchorage International Airport: Airfield Safety and
Blast Protection |
| Allocation |
AMD-Ted
Stevens Anchorage International Airport: Annual Improvements |
| Allocation |
Ted
Stevens Anchorage International Airport: Communication Equipment
and System Relocation |
| Allocation |
Ted
Stevens Anchorage International Airport: Deicing System |
| Allocation |
Ted
Stevens Anchorage International Airport: Energy and Terminal
Systems Upgrades |
| Allocation |
AMD-Ted
Stevens Anchorage International Airport: Environmental Compliance
and Cleanup |
| Allocation |
Ted
Stevens Anchorage International Airport: Equipment |
| Allocation |
Ted
Stevens Anchorage International Airport: Field Maintenance Facility |
| Allocation |
Ted
Stevens Anchorage International Airport: Information Technology
Systems |
| Allocation |
Ted
Stevens Anchorage International Airport: Land Acquisition and
Mitigation |
| Allocation |
Ted
Stevens Anchorage International Airport: Master Plan |
| Allocation |
Ted
Stevens Anchorage International Airport: Noise Abatement Program
Implementation |
| Allocation |
Ted
Stevens Anchorage International Airport: North Terminal Waterline
Replacement |
| Allocation |
Ted
Stevens Anchorage International Airport: Old International Airport
Road Upgrade |
| Allocation |
Ted
Stevens Anchorage International Airport: Roads, Utilities & Grounds
Construction and Upgrades |
| Allocation |
Ted
Stevens Anchorage International Airport: Security, Safety, and
Access Control Improvements |
| Allocation |
Ted
Stevens Anchorage International Airport: Security, Safety, Emergency
Access Control and Communication Center |
| Allocation |
Ted
Stevens Anchorage International Airport: Site Development Preparation |
| Allocation |
Ted
Stevens Anchorage International Airport: Taxiway and Runway Improvements |
| Allocation |
Ted
Stevens Anchorage International Airport: Terminal Rehabilitation |
| Allocation |
AMD-Ted
Stevens Anchorage International Airport: Terminal Relocations |
| Allocation |
AMD-Toksook
Bay: Airport Relocation |
| Allocation |
Tuntutuliak:
Snow Removal Equipment - Loader |
| Allocation |
Tununak:
Snow Removal Equipment - Loader |
| Allocation |
AMD-Ugashik:
Snow Removal Equipment - Grader |
| Allocation |
Wrangell:
Airport Access Road Realignment |
| Allocation |
Yakutat:
Airport Snow Removal Equipment Building Replacement |
| Allocation |
Yakutat:
Runway, Apron, and Taxiway Improvements |
| Appropriation |
Surface Transportation
Program |
| Allocation |
Akiachak:
Sanitation Road Resurfacing |
| Allocation |
Alaska
Highway: Milepost 1308 - Tok Weigh Station |
| Allocation |
Alaska
Marine Highway System: Auke Bay West Terminal Modifications |
| Allocation |
Alaska
Marine Highway System: Columbia Refurbishment |
| Allocation |
AMD-Alaska
Marine Highway System: Hollis Ferry Boat (Inter-Island Ferry
Authority) |
| Allocation |
Alaska
Marine Highway System: Metlakatla Ferry (new construction) |
| Allocation |
Alaska
Marine Highway System: Metlakatla Terminal Modifications |
| Allocation |
Alaska
Marine Highway System: Prince William Sound Ferry (Ferry #1) |
| Allocation |
Alaska
Marine Highway System: Sitka and Auke Bay Terminal Improvements |
| Allocation |
AMD-Alaska
Marine Highway System: Tustumena Refurbishment |
| Allocation |
Alaska
Marine Highway System: Tustumena Vehicle Elevator Control Upgrade |
| Allocation |
Alaska
Marine Highway System: Valdez Staging Area Modifications |
| Allocation |
Ambler:
Sewage Lagoon Road |
| Allocation |
Anchorage:
Air Quality Awareness Public Education Campaign |
| Allocation |
Anchorage:
Automated Operating System for People Mover |
| Allocation |
AMD-Anchorage:
Campbell Creek Trail Connection |
| Allocation |
AMD-Anchorage:
CMAQ - Bicycle and Pedestrian Safety Campaign |
| Allocation |
AMD-Anchorage:
CMAQ - School District Compressed Natural Gas Busses |
| Allocation |
Anchorage:
C Street Reconstruction Phase 2 - International Airport Road
to Dimond Boulevard |
| Allocation |
Anchorage:
Dowling Road Reconstruction - Lake Otis Parkway. to Old Seward
Highway: |
| Allocation |
AMD-Anchorage:
Highway Safety Improvement Projects (HSIP) |
| Allocation |
Anchorage:
Huffman Road Intersection Improvements |
| Allocation |
Anchorage:
Inspection and Monitoring Evader Sticker Program |
| Allocation |
Anchorage:
National Highway System Intersection Improvements |
| Allocation |
Anchorage:
Old Glenn Highway Rehabilitation - Artillery Road to North Eagle
River Exit |
| Allocation |
Anchorage:
Oxygen Sensor Replacement Program |
| Allocation |
Anchorage:
Pavement Replacement Program |
| Allocation |
Anchorage:
Pedestrian Safety and Accessibility Improvements |
| Allocation |
Anchorage:
Private Sector Block Heater Incentive Program |
| Allocation |
Anchorage:
Purchase of Regenerative Air Street Sweepers for Municipality
of Anchorage |
| Allocation |
Anchorage:
Ridesharing and Transit Marketing |
| Allocation |
Anchorage:
Transportation Research Household Survey |
| Allocation |
Anchorage:
Transit Route Analysis |
| Allocation |
Anchorage:
Youth Employment Program for Transit Stop and Trail Accessibility |
| Allocation |
Bethel:
Boardwalk Construction |
| Allocation |
AMD-Bethel:
Chief Eddie Hoffman Highway Separated Pathway (Anton Anvil Path) |
| Allocation |
Bethel:
Tundra Ridge Road Improvements |
| Allocation |
Buckland
River Bridge |
| Allocation |
Central
Region: Winter Trail Marking |
| Allocation |
Commercial
Vehicle Enforcement Program |
| Allocation |
AMD-Dalton
Highway: Milepost 175 to 209 Reconstruction |
| Allocation |
AMD-Dalton
Highway: Milepost 362 to 413 Reconstruction |
| Allocation |
AMD-Delong
Mountain Airport Access and Related Planning |
| Allocation |
Edgerton
Highway: Chitina Bike and Pedestrian Facility |
| Allocation |
Dalton-Elliot
Highway: Milepost 28 to 72 Rehabilitation and Paving |
| Allocation |
AMD-Elliot
Highway: Milepost 127 to 131 Reconstruction and Surfacing |
| Allocation |
Emmonak:
Community Roads |
| Allocation |
Fairbanks:
2nd and Wilbur Reconstruction |
| Allocation |
Fairbanks:
Airport and Cushman Intersection Improvements |
| Allocation |
Fairbanks:
Catalytic Converter Replacement Pilot Project |
| Allocation |
Fairbanks:
Chena River Bike Trail |
| Allocation |
Fairbanks:
Courthouse Traffic Revisions |
| Allocation |
AMD-Fairbanks:
Downtown Transit and Cultural Intergration Planning |
| Allocation |
Fairbanks:
Electrical Plug-In and Operation Program |
| Allocation |
Fairbanks:
Geist Road and University Intersection Improvements |
| Allocation |
Fairbanks:
Johansen Expressway and Peger Road Off-Ramp Improvements |
| Allocation |
AMD-Fairbanks:
Lavelle Young Wheelhouse Siting |
| Allocation |
AMD-Fairbanks:
Light Emitting Diode Signal Installation |
| Allocation |
Fairbanks:
University of Alaska - Fairbanks New Geist Access |
| Allocation |
AMD-Glenn
Highway: Milepost 30 to 34 Rehabilitation - Knik River to Parks
Highway |
| Allocation |
Glenn
Highway: Milepost 68 to 84 Reconstruction - Chickaloon |
| Allocation |
Glenn
Highway: Milepost 92 to 97 Reconstruction - Cascade to Hicks
Creek |
| Allocation |
AMD-Glenn
Highway: Milepost 100 to 109 Reconstruction - Caribou Creek |
| Allocation |
Glennallen:
Glenn Highway Bike Path |
| Allocation |
Homer:
Bartlett and Hohe Street Rehabilitation |
| Allocation |
Homer:
East End Road Milepost 0.0 to 3.75 Rehabilitation |
| Allocation |
AMD-Homer:
Spit Pedestrian Pathway - Phase 2 |
| Allocation |
Igiugig:
Sanitation Road |
| Allocation |
AMD-Juneau:
Egan Intersection Improvements (Tenth Street) |
| Allocation |
Kenai:
Spur Road Extension |
| Allocation |
Kenai:
Kenai Spur Road Unity Trail Pedestrian and Bike Path |
| Allocation |
AMD-Kenai
Peninsula Borough: Deep Creek Beach Access Improvement |
| Allocation |
AMD-Ketchikan:
Acquire Three New Busses |
| Allocation |
Ketchikan:
North Tongass Highway - Ward Cove to Whipple Creek |
| Allocation |
Ketchikan:
Tongass - Main and Mill Signal Installation |
| Allocation |
Ketchikan:
Tongass - Third Avenue Extension Completion |
| Allocation |
Ketchikan:
Tongass - Viaducts Replacement and Rehabilitation |
| Allocation |
Kodiak:
Pasagshak Road Realignment and Improvement |
| Allocation |
Kotzebue:
Dust Control Demonstration Project |
| Allocation |
Kotzebue:
Shore Avenue Rehabilitation and Erosion Protection |
| Allocation |
Lower
Yukon Trail Staking |
| Allocation |
Mat-Su:
Hatcher Pass - Phase 1 |
| Allocation |
Mat-Su:
Hatcher Pass: Scenic Overlook & Trailhead Construction - Phase
2 |
| Allocation |
Mat-Su:
Knik-Goose Bay Road Rehabilitation |
| Allocation |
Mitkof
Highway: Ferry Terminal South Resurfacing |
| Allocation |
Nenana:
Port Access |
| Allocation |
AMD-Nome:
Nome-Council Road - Solomon Wayside |
| Allocation |
Nome:
Rocker Gulch Wayside |
| Allocation |
North
Pole: Bike Trail Rehabilitation and Connections |
| Allocation |
North
Tongass Highway Pavement Restoration |
| Allocation |
Northern
Region: ADA Pedestrian Facilities |
| Allocation |
Northway:
Road Improvement |
| Allocation |
Palmer:
Urban Revitalization |
| Allocation |
Parks
Highway: Parks Highway and Glenn Highway Interchange |
| Allocation |
AMD-Parks
Highway: Milepost 37 to 44 - Church Street to Seward Meridian
Road Rehabilitation |
| Allocation |
Parks
Highway: Milepost 67-72 Rehabilitation - White's Crossing to
Willow |
| Allocation |
AMD-Parks
Highway: Milepost 206 to 210 Rehabilitation - Summit to Cantwell
and Jack River Bridge Channel Control |
| Allocation |
Parks
Highway: Milepost 276 - Rex Railroad Overcrossing |
| Allocation |
AMD-Parks
Highway: Milepost 351 to 356 Rehabilitation |
| Allocation |
Parks
Highway: Nenana Canyon Safety/Access Improvements - Phase 2 |
| Allocation |
Pedro
Bay: Bridge Replacement |
| Allocation |
Petersburg:
Mitkof Highway Coastal Path |
| Allocation |
Rampart
Road Eureka Connector |
| Allocation |
Richardson
Highway: Milepost 127 - Gulkana River Wayside |
| Allocation |
AMD-Richardson
Highway: Milepost 203 to 206 Reconstruction - McCallum Creek
to Rainbow Mountain |
| Allocation |
Richardson
Highway: Milepost 275 North Erosion Control |
| Allocation |
Richardson
Highway: Milepost 306 Birch Lake Wayside |
| Allocation |
Richardson
Highway: Milepost 357 - Badger Road Interchange |
| Allocation |
Richardson
Highway: Milepost 357 - Fairbanks New Weigh Station |
| Allocation |
AMD-Richardson
Highway: Milepost 360 - Old Richardson Exit Ramp |
| Allocation |
Right
of Way Permitting and Project Development Management System |
| Allocation |
St.
Mary's: Airport Road Rehabilitation |
| Allocation |
Seward:
Harbor Pedestrian Pathway |
| Allocation |
Seward:
Port Avenue Rehabilitation |
| Allocation |
Seward
Highway: Milepost 0.0 to 8 Reconstruction and Pathway - Seward
to Grouse Creek Canyon |
| Allocation |
Seward
Highway: Turnagain Pass Reststop |
| Allocation |
Sitka:
Harbor Drive Lighting, Pedestrian and Bicycle Improvements |
| Allocation |
Soldotna:
East Redoubt Avenue, Soldotna Improvements |
| Allocation |
Southeast
Alaska Transportation Plan Implementation Management |
| Allocation |
Southeast
Region: Light Emitting Diode Signal Installation |
| Allocation |
Statewide:
National Highway System and Bridge Refurbishment |
| Allocation |
Statewide:
Non-National Highway System and Bridge Refurbishment |
| Allocation |
Statewide:
Air Quality Public Education |
| Allocation |
Statewide:
Annual Planning Work Program |
| Allocation |
Statewide:
Bridge Inventory, Inspection, Monitoring, Rehabilitation, and
Replacement Program |
| Allocation |
Statewide:
Bridge Scour Monitoring and Retrofit Program |
| Allocation |
Statewide:
Civil Rights Program |
| Allocation |
Statewide:
Comprehensive Document Management System |
| Allocation |
AMD-Statewide:
Culvert Repair or Replace Project |
| Allocation |
Statewide:
Hightower Lighting System Replacement |
| Allocation |
Statewide:
Highway Data Equipment Acquisition and Installation |
| Allocation |
AMD-Statewide:
Highway Fuel Tax Evasion |
| Allocation |
Statewide:
National Highway Institute and Transit Institute Training |
| Allocation |
Statewide:
National Highway System Highway Safety Improvement Program (HSIP) |
| Allocation |
Statewide:
Non-National Highway System Highway Safety Improvement Program
(HSIP) |
| Allocation |
Statewide:
Public Transportation Social Service Van Replacement |
| Allocation |
Statewide:
Research Program |
| Allocation |
Statewide:
Road Surface Treatments |
| Allocation |
Statewide:
Rural Alaska Training Initiative |
| Allocation |
Statewide:
Scenic Byways Grants |
| Allocation |
Statewide:
Scenic Viewshed Enhancement |
| Allocation |
Statewide:
Seismic Retrofit - Bridges |
| Allocation |
Statewide:
Urban Planning Program |
| Allocation |
Steese
Highway: Fox New Weigh Station |
| Allocation |
Steese
Highway: Pedro Monument Historical Wayside |
| Allocation |
Sterling
Highway: Soldotna Urban & Kenai River Bridge #0671 Replacement
Phase 2 |
| Allocation |
Sterling
Highway: Milepost 161.4 - Erosion Protection |
| Allocation |
Stevens
Village: Sanitation Road |
| Allocation |
Surface
Transportation Preconstruction |
| Allocation |
Talkeetna:
Parking Lot and Pedestrian Safety Access |
| Allocation |
Tok
Cutoff: Milepost 110 to 124 Reconstruction - Clearwater Creek
to Tok |
| Allocation |
Unalaska:
Airport Beach Road Pathway Phase II |
| Allocation |
AMD-Unalaska:
East Point Ballyhoo Road Rehabilitation - Phase 1 |
| Allocation |
Unalaska:
South Channel Bridge Construction |
| Allocation |
AMD-Whittier:
Maintenance and Operations |
| Allocation |
Whittier:
Ferry Access Road |
| Allocation |
AMD-Deleted:
Dalton Highway: Bridge Strengthening |
| Allocation |
AMD-Deleted:
Dalton Highway: Milepost 274 to 289 Reconstruction - Galbraith
Lake Airport to Kuparuk River |